Chip sealing on Highway 83 begins
The Montana Department of Transportation (MDT) and LHC Inc. expect to seal and cover (chip seal) the north and south segments of Montana Highway 83 (MT 83) the week of June 17, weather dependent.
The week of June 17, travelers can expect chip sealing on both segments, delays up to 25-30-minutes due to increased traffic volumes and traffic control in place. Anticipate single-lane closures, temporary traffic lights, and pilot cars. Typical working hours are 7 a.m. to 9 p.m.
Be prepared for delays before you leave, download MDT’s mobile app “MDT 511” or visit 511mt.net [511mt.net] and check your route. If you’re driving and want to check in, pull safely off the road and dial 511. Tune in to local radio stations and watch for variable message signs along the route.